Respecting Resources, Improving How We Work
We remind you that tomorrow 8.30 p.m.. - 9.30 p.m (local time) is Earth Hour, when we switch off lights to help the planet. One of the most important steps in this direction is our solar installation. During the peak months, it generates an average of 100 to 130 kWh per day—an amount that covers a significant portion of our daily consumption. The installation spans approximately 400 to 600 sq.m and is designed to maximize the use of solar energy. A key component of the installation system is the heat pump, which provides heating and cooling with significantly higher efficiency than conventional solutions. By using the energy we produce ourselves, it further reduces both operational costs and our carbon footprint.
As part of our efforts to reduce emissions in our day-to-day operations, the internal vehicles used between warehouse areas are also electric. It’s a meaningful step toward a cleaner working environment.